彩鋼壓力板、夾芯板的吊裝方法有汽車吊裝、塔式吊裝、提升機(jī)吊裝、手工改進(jìn)等。在吊裝方式上,小車吊裝,多采用鋼梁吊裝點(diǎn)進(jìn)行改進(jìn)。這種吊裝方式一次可以舉起多個(gè)板,但在面積較大的工程中,增加的壓力板不容易送到裝修。
The hoisting methods of color steel pressure plate and sandwich plate include automobile hoisting, tower hoisting, hoist hoisting, manual improvement, etc. In terms of lifting method, the steel beam lifting points are often used to improve the trolley lifting. This hoisting method can lift multiple plates at a time, but in large projects, the increased pressure plate is not easy to be sent to the decoration.
增加了人工搬運(yùn)屋頂?shù)拈L距離,屋頂行走困難,已安裝的彩鋼板容易損壞,不能發(fā)揮技能提高大型起重機(jī)噸位和能力,使用率低,機(jī)械成本高。但改進(jìn)方便,被改進(jìn)板材不易損壞。
It increases the long distance of manual handling of the roof, makes it difficult for the roof to walk, and the installed color steel plate is easy to be damaged. It can not play the professional skills to improve the tonnage and capacity of large cranes, with low utilization rate and high mechanical cost. But the improvement is convenient and the improved plate is not easy to be damaged.
用絞車提出的方法由于無需大型機(jī)械,設(shè)備可以靈敏地移動(dòng)到需要設(shè)備的地址,因而方便且具有低廉。這個(gè)方法每次改進(jìn)的數(shù)量少,但屋頂短運(yùn)輸距離,是一個(gè)人工的方法的改進(jìn)是經(jīng)常使用在項(xiàng)目董事會(huì)不長,這個(gè)方法是更方便和底價(jià),但有必要從事,否則損壞,使用更多的人力,勞動(dòng)強(qiáng)度。
The method proposed by the winch is convenient and cheap because it does not need large machinery and the equipment can be moved to the address of the required equipment sensitively. The number of each improvement of this method is small, but the roof short transportation distance is a manual method improvement which is often used in the project board of directors is not long, this method is the most convenient and base price, but it is necessary to engage in, otherwise damage, use more manpower, labor intensity.
提高板材的水平是很困難的,在所有這些方面,人們發(fā)明了鋼絲滑抬法。這種方法是建立在建造山墻主干道線,線的袖子,彩色鋼板鋼管,蓋屋頂用鋼管沿鋼絲拉繩,知識(shí)是提高板屋頂,然后由工人轉(zhuǎn)移到設(shè)備地址。吊裝方法多種多樣,根據(jù)具體施工情況選擇適用的施工方法十分重要。
It is very difficult to improve the professional level of sheet metal. In all these aspects, people invented the steel wire sliding lifting method. This method is based on the construction of the main road line of the gable, the sleeve of the line, the color steel plate steel pipe, the steel pipe for roof covering along the steel wire to pull the rope, the professional knowledge is to improve the slab roof, and then the workers transfer to the equipment address. There are various hoisting methods, so it is very important to choose suitable construction methods according to the specific construction situation.
以上是
濟(jì)南彩鋼廠家小編為大家介紹的相關(guān)內(nèi)容,想要了解更多內(nèi)容,歡迎訪問網(wǎng)站:http://www.nbcmds.com
The above is the relevant content introduced by Jinan color steel factory. If you want to know more, please visit the website: http://www.nbcmds.com