您好,歡迎訪問禹城泰瑞彩鋼復合板加工廠!

服務熱線

18765446878

熱門關鍵詞:禹城彩鋼廠,禹城彩鋼復合板,禹城鋼結構板房 彩鋼板房
當前位置:首頁>新聞資訊>新聞動態(tài)天齊惡劣彩鋼板房是如何進行施工的?

天齊惡劣彩鋼板房是如何進行施工的?

來源:http://www.nbcmds.com 日期:2021-07-14 發(fā)布人:
注意人身:施工單位應為職工提供足夠的食品飲料和發(fā)放清涼油、風油精等防暑降溫的藥品。露天和高溫作業(yè)者應多喝茶水、綠豆湯和含鹽濃度0.1-0.3%的清涼飲料,但切記暴飲,每次不超過300毫升。施工現場嚴禁施工人員赤膊、穿拖鞋和酒后上崗,禁止帶病作業(yè),要加強個人防護。
First of all, pay attention to personal safety: the construction unit shall provide sufficient food and drink for the staff and distribute cooling oil, essential balm and other heatstroke prevention drugs. Outdoor and high temperature workers should drink more tea, mung bean soup and cool drinks with 0.1-0.3% salt concentration, but remember to drink too much, no more than 300 ml each time. On the construction site, it is strictly forbidden for the construction personnel to work naked, wear slippers and after drinking. It is forbidden to work with diseases, and personal protection should be strengthened.
其次,工程雨天施工時,彩鋼房工程宜搭設臨時防護棚,雨水不得飄落在熾熱的焊縫上.如焊接部位比較潮濕,必須用干布擦凈并在焊接前用氧炔焰烤干,保持接縫干燥,沒有殘留水分。雨天施行彩鋼房工程吊裝時,構件上如有積水,安裝前應干凈,但不得損涂層,高強螺栓接頭安裝時,構件摩擦面應干凈,不能有水珠,更不能雨淋和接觸泥土及油污等臟物。
Secondly, when the project is constructed in rainy days, the temporary protective shed should be set up for the color steel room project, and the rain should not fall on the hot welding seam. If the welding part is wet, it must be cleaned with dry cloth and dried with oxyacetylene flame before welding, so as to keep the joints dry without residual moisture. During the hoisting of color steel house in rainy days, if there is water on the component, it shall be cleaned before installation, but the coating shall not be damaged. During the installation of high-strength bolt joint, the friction surface of the component shall be clean, without water drops, rain, soil, oil and other dirt.
還有就是,工程雨天天氣構件不能進行涂刷工作。雨天及五級以上大風不能進行屋面保溫的施工。雨天由于空氣比較潮濕,焊條儲存應防潮并進行烘烤,同一焊條重復烘烤次數不宜超過兩次,并由管理人員及時做好烤記錄。
In addition, the components cannot be painted in rainy days. Roof insulation construction can not be carried out in rainy days and gale above level 5. In rainy days, because the air is humid, the welding rod should be stored moisture-proof and baked. The same welding rod should not be baked more than twice, and the management personnel should make baking records in time.
施工的時候如遇上大風天氣,柱、主梁、支撐等大構件應立即進行校正,位置校正正確后立即進行固定,以防止發(fā)生單側失穩(wěn).當天安裝的構件,應形成空間穩(wěn)定體系
In case of windy weather during construction, large components such as column, main beam and support shall be corrected immediately. After correct position correction, they shall be fixed immediately to prevent unilateral instability. Components installed on the same day shall form a space stable system

聯系電話:18765446878

咨詢熱線:18765446878(微信同號)

地址:禹城市十里望鎮(zhèn)山東國際商貿港往南660米

備案號:魯ICP備2023024436號 魯公網安備37010202001695號 網站地圖|XML|TXT

微信二維碼

微信二維碼