為確保整個(gè)
濟(jì)南彩鋼板房工程的目標(biāo)的實(shí)現(xiàn),在彩鋼板房加固施工過(guò)程中,應(yīng)加強(qiáng)技術(shù)管理的落實(shí)和實(shí)施。下面小編來(lái)講講更多的施工事項(xiàng)吧。
In order to ensure the realization of the safety goal of the whole Jinan color steel plank house project, the implementation and implementation of safety technology management should be strengthened during the reinforcement construction of color steel plank houses. Now let's talk about more construction safety matters.
搭設(shè)人員須戴帽、系帶、穿防滑鞋。
Erectors must wear safety helmets, safety belts and anti-skid shoes.
各構(gòu)配件質(zhì)量與搭設(shè)質(zhì)量,按規(guī)范規(guī)定進(jìn)行檢查驗(yàn)收,合格后方可使用。
The quality and erection quality of all components and fittings shall be inspected and accepted according to the specifications, and can only be used after they are qualified.
當(dāng)有六級(jí)及六級(jí)以上大風(fēng)和霧、雨等天氣時(shí),應(yīng)停止高處施工作業(yè)。
In case of strong wind of force 6 or above, fog, rain and other weather, construction at heights shall be stopped.
雨天后作業(yè),須進(jìn)行檢查和驗(yàn)收,合格后方可進(jìn)行作業(yè)。
Operation after rainy days must be inspected and accepted before operation.
作業(yè)人員應(yīng)佩戴工具袋,工具用后裝于袋中,以免掉落傷人。架設(shè)材料要隨建筑上隨用,以免放置不當(dāng)時(shí)掉落。
The operator shall wear a tool bag, and the tools shall be put into the bag after use to avoid falling and hurting people. Erection materials shall be used along with Chinese buildings to avoid falling when they are not placed properly.
作業(yè)前應(yīng)注意檢查作業(yè)環(huán)境是否可靠,防護(hù)設(shè)施是否齊全有效,確認(rèn)無(wú)誤后方可作業(yè)。
Before operation, pay attention to check whether the operation environment is reliable and whether the safety protection facilities are complete and effective. Operation can be started only after confirmation.
彩鋼板房加固地錨,須牢固可靠,鋼絲繩應(yīng)拉緊,鋼絲繩應(yīng)采用鐵絲等輔助綁扎固定牢固,防止其沿鋼管縱向滑動(dòng)。
The ground anchor for the reinforcement of the color steel plate house must be firm and reliable, the steel wire rope should be tightened, and the steel wire rope should be bound and fixed firmly with iron wire and other aids to prevent it from sliding longitudinally along the steel pipe.
進(jìn)行電、氣焊作業(yè)時(shí),須有防火措施和專(zhuān)人監(jiān)護(hù)。
When conducting electric and gas welding operations, fire prevention measures must be taken and special personnel must be assigned for supervision.
鋼管網(wǎng)格架搭設(shè)時(shí),地面應(yīng)設(shè)圍欄和警戒標(biāo)志,并派專(zhuān)人監(jiān)守,嚴(yán)禁非操作人員入內(nèi)。
When the steel pipe grid is erected, fences and warning signs shall be set on the ground, and special personnel shall be assigned for supervision. Non operators are not allowed to enter.
高處作業(yè)人員應(yīng)作好分工和配合,不得一人單獨(dú)作業(yè),傳遞桿件應(yīng)掌握好,平穩(wěn)傳遞。不要用力過(guò)猛,以免引起人身或桿件失衡。對(duì)每完成的一道工序,要相互詢(xún)問(wèn)并確認(rèn)的才能進(jìn)行下一道工序。更多注意事項(xiàng)就來(lái)我們網(wǎng)站
http://www.nbcmds.com咨詢(xún)吧!
The personnel working at heights shall do a good job of division of labor and cooperation, and shall not work alone. The transfer rods shall have a good grasp of the center of gravity and be transferred smoothly. Do not use excessive force to avoid imbalance of human body or rod. For each completed process, the next process can only be carried out after mutual inquiry and confirmation. More notes on our website http://www.nbcmds.com Consult!